HOHE SEE

JDR has been awarded the inter array cable contract by Boskalis for the EnBW Hohe See offshore wind farm. EnBW Hohe See will be constructed in the so-called “exclusive economic zone” of the North Sea around 90 kilometres north of Borkum and 100 kilometres northwest of Helgoland covering an area of 42 square kilometres in water depth of up to 40m.

The Hohe See project will utilise over 54.7km of 33kV copper core inter-array cables and a range of termination accessories. The cables will be manufactured at JDR’s state-of-the-art manufacturing facility in Hartlepool.

When fully operational, the wind farm will generate around two billion kilowatt hours of electricity per year with its output of 497 Megawatts, distributed across 71 wind turbines. This energy will supply around 560,000 households and save around 1.5 million tonnes of CO2 per year