
Dai Hung – Phase 3, Block 05-1(a), Offshore Vietnam
menu opisówka
16th June 2023
Dai Hung – Phase 3, Block 05-1(a), Offshore Vietnam
The Phase 3 of the Dai Hung project, located in Block 05-1(a) offshore Vietnam, was completed. Phase 3 involved the delivery of a 3 km dynamic subsea power system, connecting the floating production unit (FPU) to the wellhead platform (WHP-D1). The subsea dynamic power cables, equipped with fibre optics, and accessories were manufactured at JDR's Hartlepool facility. After production, the cables were loaded onto drums with a diameter of 9.2 meters and shipped to the installation site. This project plays a crucial role in the energy infrastructure of the region.