
Greater Gabbard Offshore Windfarm
menu opisówka
16th April 2008
Greater Gabbard Offshore Windfarm
JDR supplied over 200 km of inter-array subsea power cables for the Greater Gabbard Offshore Windfarm, connecting 140 turbines to offshore substations. These cables were designed for the smallest diameter while ensuring strength and reliability for field installation. JDR’s advanced cable technology and installation expertise were key to the wind farm's success.