Dudgeon Offshore Wind Farm – 95km of Copper Core Inter-Array Cables

JDR was awarded a contract for the Statoil/Statkraft Dudgeon Offshore Wind Farm, located 32 km off the Norfolk coast. The project used over 95 km of copper core inter-array cables, including 185 mm² and 500 mm² copper conductors. Manufactured at JDR's Hartlepool facility, these cables connected 67 turbines to mainland UK and included a range of cable accessories for efficient installation.