Media Centre
menu opisówka
27th November 2026
The team at our Littleport facility has delivered a technically complex crawler umbilical on time for Debmarine Namibia’s diamond recovery vessel, the MV Mafuta.
With an overall diameter close to 200 mm, it represents one of the largest-diameter products manufactured at the facility.
The umbilical comprises 15 hydraulic lines, seven 70 mm² power cable triads, six fibre-optic lines and eight 2.5 mm² twisted pairs.
Projects of this complexity reflect the trust our clients place in our engineering and manufacturing capabilities.
We welcome the challenges they bring and the opportunity to continue expanding what we can deliver.
We are proud of the Littleport team’s expertise and commitment in successfully delivering another demanding project on schedule.
#JDRCableSystems #Umbilicals #Engineering #Manufacturing #Littleport #DebmarineNamibia
Go to our LinkedIn profile
With an overall diameter close to 200 mm, it represents one of the largest-diameter products manufactured at the facility.
The umbilical comprises 15 hydraulic lines, seven 70 mm² power cable triads, six fibre-optic lines and eight 2.5 mm² twisted pairs.
Projects of this complexity reflect the trust our clients place in our engineering and manufacturing capabilities.
We welcome the challenges they bring and the opportunity to continue expanding what we can deliver.
We are proud of the Littleport team’s expertise and commitment in successfully delivering another demanding project on schedule.
#JDRCableSystems #Umbilicals #Engineering #Manufacturing #Littleport #DebmarineNamibia
-
4th November 2026How JDR is building a more sustainable and resilient supply chain
-
3rd September 2026Beyond the cable: supporting offshore wind through integrated installation services
-
28th August 2026Developing Future Engineering Talent
-
29th July 2026How subsea cable innovation is supporting offshore wind and deeper-water energy projects
-
28th May 2026How JDR is powering skills, communities and the UK energy transition
-
30th April 2026JDR to Provide Subsea Control Umbilicals for Amplitude Energy’s East Coast Supply Project, Supporting Gas Delivery to Victoria
-
2nd March 2026JDR appoints former UK Trade Commissioner Jonathan Knott CMG as Deputy CEO
-
7th January 2026Beyond the baseline: Why sustainable supply chains are the key to AR7 and AR8 success